Bathroom Remodel cost in 2026
What a bathroom remodel involves, what it runs in each state we build in, what moves the price, and how to price it for your ZIP code.
What the project involves
A bathroom remodel ranges from a like-for-like refresh of a hall bath to a primary suite with a curbless shower, freestanding tub and heated floors. Tile labor, waterproofing and plumbing relocation drive most of the difference; the fixtures themselves are a smaller share than people expect.
Our bathroom pricing starts from a local base range at a standard finish, scaled by the size of the room, the finish level and the scope you choose — moving fixtures, a shower-tub conversion, structural changes or an older home that needs new supply and drain lines.
This guide prices the work on our Bathroom Remodeling service page.
What's included
At the standard finish level, the range covers:
- Demolition of the old surround, fixtures and flooring, with walls patched back to a clean canvas
- Tile work — shower or tub surround to standard height — plus the shower pan or tub itself
- Vanity, faucet, toilet and the rest of the fixture package at the standard finish level
- Flooring, lighting, a properly vented exhaust fan, and paint
- Plumbing reconnections at the existing fixture locations, done by our own crew
- Waterproofing behind the tile, which is what keeps the bathroom from being redone in five years
Across our four states
Prices as of Nov 4, 2026
| State | Priced at | Standard | Premium | Luxury |
|---|---|---|---|---|
| Washington | Seattle · Powder room | $15K – $21K | $18K – $25K | $22K – $31K |
| Idaho | Boise · Powder room | $11K – $15K | $13K – $19K | $16K – $23K |
| Montana | Billings · Powder room | $10K – $14K | $12K – $17K | $15K – $21K |
| Arizona | Scottsdale · Powder room | $13K – $19K | $16K – $23K | $20K – $29K |
Planning-level ranges from our current pricing tables, standard finish at a typical size unless a column says otherwise. Land, design and permit fees, utility connections and unusual soils are priced separately.
What drives the cost
- 1
Which bathroom it is
The base range is per bathroom and steps with the room: a powder room, a hall or guest bath, and a primary suite bath each start from their own range, and the primary bucket runs more than three times the powder room.
- 2
Scope
A full renovation is the baseline. A refresh (fixtures and surfaces, same footprint) runs about 15% less; a full custom bathroom about 15% more; and building a new bathroom where none exists about 25% more because every supply, drain and vent line is new.
- 3
Moving fixtures
Keeping every fixture where it is costs nothing extra. Moving one fixture adds about 6%, relocating the layout about 12%, and expanding the footprint or adding a window or skylight about 18%.
- 4
Finish level
Standard is quality builder-grade finishes that last. Premium (quartz, custom cabinetry, designer fixtures) adds about 22%; Luxury (marble, steel and glass, the bathrooms on our portfolio) adds about 50%.
- 5
Tub-to-shower conversion
Converting a tub to a walk-in shower adds about 5% for the new pan, drain and glass.
- 6
Tile height and heated floor
Taking the tile to the ceiling adds about 4%; an electric heated floor about 3%. Both are small on their own and worth deciding before the rough-in.
- 7
Where the house is
Labor and permits move with the market, so the calculator applies roughly three-quarters of your location factor to a bathroom — the fixtures and tile cost about the same everywhere.
Seattle-area pricing
Our Puget Sound standard tier is the baseline, priced from our Federal Way headquarters. Inside Seattle city limits the calculator adds about 13% for SDCI permitting, parking and staging constraints and design review. The Eastside premium tier (Bellevue, Kirkland, Redmond, Mercer Island and neighbors) runs about 20% above the baseline for permit and impact fees, inspection lead times, tight lots and finish expectations. Island and ferry-served sites carry about 17% for barge and ferry logistics. South of the baseline, the South Sound and Peninsula tier prices about 12% below and the North Sound tier about 9% below, both served from our Federal Way headquarters; Southwest Washington is priced from our Vancouver office. A bathroom's cost is mostly fixtures, tile and skilled hours in a small room, so the calculator applies about three-quarters of those location differences here.
A real example

The Billings Bathroom was rebuilt in place without moving a wall: a new soaker tub with a calacatta-look marble surround, a matte-black rain shower with handheld, a warm wood vanity with a marble top, an arched black-frame mirror with brass-and-glass sconces, a bidet smart toilet and a patterned star-motif tile floor. Same footprint, a completely different bathroom.
See Billings BathroomPermits and fees
Usually priced separately from the range above:
- Design and permit fees — plumbing and electrical permits at minimum, plus a building permit when the footprint or structure changes
- Structural work if a window or skylight is added or a wall moves
- Utility upgrades such as a larger water heater or a dedicated circuit for a heated floor or bidet seat
- Fixtures you buy yourself — we install owner-supplied fixtures, but the warranty on them is the manufacturer's
Ways to save without cutting corners
- 1
Leave the toilet and shower drain where they are. Fixture relocation is one of the larger multipliers in a bathroom, and the plumbing under a slab or between floors is where surprises live.
- 2
Put the money in waterproofing and tile labor. A standard-height surround done right outlasts a floor-to-ceiling feature wall done fast.
- 3
Pick the vanity and fixtures before demo. Rough-in heights for a wall-hung vanity or a rain head are set early and are expensive to move later.
- 4
Do two bathrooms in one project. The calculator scales by bathroom count, but mobilization, dust protection and inspections are shared, so the second bathroom costs less per room than the first.