Whether you need a second story, a bump-out, a mother-in-law suite, or a full gut-and-modernize, we add and rebuild space without turning your home into a construction site for a year. We tie new framing into old, match rooflines, and bring outdated mechanical and electrical up to current code.

Additions are unforgiving — a roofline that doesn't line up or a foundation that doesn't match tells on the builder forever. We engineer the connection between old and new, protect the parts of the house you're keeping, and sequence the work so you keep living there where possible. Because we self-perform the trades, opening a wall doesn't trigger a scramble to find a plumber; our own crew is already scheduled.

What's included

  • Second-story and bump-out additions

    Building up or out: a second story over the existing frame or a bump-out on the ground, each engineered for the new load paths and tied into the house so it reads as one home.

  • Whole-home modernization and reconfiguration

    Whole-home modernization — opening floor plans, reworking kitchens and baths, replacing finishes — sequenced so you keep living in the house where possible.

  • Structural engineering for new load paths

    Our in-house engineers design the connection between old and new, including beams, posts and footings when a wall comes out or a floor goes on top.

  • Matching rooflines, siding, and foundation

    We match roof pitch, siding profile, trim and the foundation so the addition doesn't tell on the builder; the exterior reads as original.

  • Mechanical, electrical, and plumbing upgrades

    Opening walls is the moment to bring old electrical, plumbing and insulation up to current code, and our own crews are already scheduled to do it.

  • Permit and inspection management

    Drawings, structural calculations, permit submittal, plan-review corrections and every inspection are handled by our office from start to final.

How it works

  1. 1
    Free advice visit

    We walk the house, look at the foundation, roof structure and lot, and talk through up versus out, phasing and budget — then leave you a scoped range.

  2. 2
    Complimentary 3D model

    You see the addition on your actual house before we draw construction documents: rooflines, windows, how the new space connects to the old.

  3. 3
    Design and engineering

    Construction drawings plus the structural engineering for the tie-in: new beams and posts, foundation checks for a second story, lateral bracing.

  4. 4
    Permits

    Building, plumbing, mechanical and electrical permits submitted and tracked by our office, with corrections answered by the people who will build it.

  5. 5
    Build

    Most of the work happens outside the existing envelope until the tie-in, which we schedule for a dry window and close quickly; the work zone is dust-walled and utilities stay live where possible.

  6. 6
    Final walkthrough

    Punch list, final inspections and a walk through every new and reworked room against the plans.

The same ten-step process runs every project we build — see how we work.

What it costs

Additions are priced per square foot against your area's build rate, and small additions cost more per foot because the foundation, roof tie-in and mechanical connections are roughly the same whether the room is 300 or 600 square feet. A second story adds about 20% for the structural work over the house, a bathroom in the addition about 12% and a kitchen about 18%; whole-home remodels scale with how much of the house you touch and whether the systems are replaced.

Home Addition cost guide

Prices as of Oct 7, 2026

StatePriced atStandardPremiumLuxury
WashingtonSeattle · 1,000 sq ft (exact)$410K – $560K$500K – $680K$615K – $840K
IdahoBoise · 1,000 sq ft (exact)$285K – $385K$350K – $470K$430K – $580K
MontanaBillings · 1,000 sq ft (exact)$248K – $335K$305K – $410K$375K – $505K
ArizonaScottsdale · 1,000 sq ft (exact)$375K – $520K$455K – $635K$560K – $780K

Planning-level ranges from our current pricing tables, standard finish at a typical size unless a column says otherwise. Land, design and permit fees, utility connections and unusual soils are priced separately.

Whole-Home Remodel cost guide

Prices as of Oct 7, 2026

StatePriced atStandardPremiumLuxury
WashingtonSeattle · 3,000 sq ft (exact)$360K – $490K$440K – $600K$540K – $735K
IdahoBoise · 3,000 sq ft (exact)$250K – $340K$305K – $410K$375K – $505K
MontanaBillings · 3,000 sq ft (exact)$218K – $295K$265K – $360K$325K – $440K
ArizonaScottsdale · 3,000 sq ft (exact)$325K – $455K$400K – $560K$490K – $685K

Planning-level ranges from our current pricing tables, standard finish at a typical size unless a column says otherwise. Land, design and permit fees, utility connections and unusual soils are priced separately.

Price my project

Timeline

  1. Design, engineering and permits

    Concept and 3D model, construction drawings, structural engineering, then plan review in your jurisdiction.

  2. Foundation and framing

    Footings and foundation for a bump-out, or shoring and beam work for a second story; framing, roof and the weather-resistive barrier follow.

  3. Tie-in

    The opening between old and new is cut, flashed and closed in one planned stretch so the house is never exposed longer than it has to be.

  4. Rough-ins, insulation and drywall

    Plumbing, HVAC and electrical extended into the new space and upgraded in the old where the walls are open, each inspected before drywall.

  5. Finishes and walkthrough

    Siding and trim to match, then flooring, cabinets, tile, paint and fixtures, final inspections and the punch-list walk.

Permits and codes

Any addition needs a building permit with drawings and structural engineering, plus plumbing, mechanical and electrical permits for the trades it touches. A second story adds a check of the existing foundation and frame; moving a bearing wall needs a beam calculation; some lots need setback variances or critical-area reports.

Our engineering and permitting team draws it, engineers it, submits it and answers the plan reviewer's corrections, then schedules the footing, framing, rough-in, insulation and final inspections. In older homes the permit is also the moment to bring knob-and-tube or undersized panels, galvanized plumbing and thin insulation up to code while the walls are open.

Where we offer it

Additions & Renovations across Washington, Idaho, Montana and Arizona

Reviewed on Google and Yelp

What clients say

  • "This company came out to bid and actually showed up at the date and time agreed upon. Once they quoted the work (at a competitive price) they had guys working that same day. They kept to their quote, and we even added…" Read more

    Jake P.
    Remodel & Drywall · Puyallup · Mar 2024
    via Yelp
  • "Sebastian and his team did an exceptional job restoring my garage — both its structural integrity and the finish — after a car plowed into it. They prioritized the structural restoration within one day of visiting the…" Read more

    Fedon M.
    Garage Restoration · SeaTac · May 2024
    via Yelp
  • "I had a great experience with ID Builder Construction. I discovered a load-bearing beam in the house was compromised due to water damage, which would have prevented me from renting it. Sebastian came in at a reasonable…" Read more

    Nikhil A.
    Structural Repair · San Jose · Apr 2024
    via Yelp

Questions, answered

Lot and structure. A bump-out uses yard and needs new footings but leaves the existing roof and frame alone; a second story keeps the footprint but adds about 20% in our estimate tool for the structural work over the house and needs the foundation and frame checked. Setbacks and lot coverage often make the choice for you, and we walk both at the free advice visit.

Sometimes as-is, often with reinforcement. Our engineers check the existing footings, stem walls and frame against the new loads and design the posts, beams and hold-downs needed; where the foundation can't carry it, we add to it rather than guess. That analysis is part of design and engineering, before anything is priced as final.

Usually yes for additions and phased renovations. Most of an addition is built outside the existing envelope until the tie-in, which we schedule for a dry window; the work zone is dust-walled and utilities stay live where possible. For a down-to-the-studs whole-home remodel with new systems, most clients move out for the heaviest stretch.

That's the whole job. We match roof pitch, siding profile, trim and the foundation, and the 3D model shows the new rooflines on your actual house before construction drawings are finished.

A building permit with drawings and stamped structural engineering, plus plumbing, mechanical and electrical permits. Second stories and bearing-wall changes add engineering for the tie-in and the existing frame; some lots add land-use review. We produce the package in-house and carry it through plan review and inspections.

Design, engineering and permitting come first and vary by city; construction depends on size, a second story versus a bump-out, and the wet rooms in the new space. We give you a phased schedule at contract rather than a guess at the first meeting.

Size (small additions cost more per foot), up versus out, bathrooms and kitchens in the new space, foundation type, how complex the tie-in is and the finish level. Our home addition cost guide walks through each factor, and the whole-home remodel guide covers interior renovations.

Yes — the permit requires it where we open walls, and it's the right time. In a pre-1980 house, replacing both the electrical and plumbing adds about 12% in our estimate tool and avoids opening finished walls again later; insulation and air-sealing are brought to the current energy code in every wall we touch.

Financing available — pre-qualify in minutes, no credit score impact.

Pre-qualify through Acorn Finance ($1,000–$100,000, 20+ lenders) or HFS Financial (up to $450,000, no home equity required).

Book your free professional advice visit

Free estimate. Free 3D design model. Free on-site advice from the builder who prices the job. No obligation.