What the project involves

A home addition adds finished square footage to your house — a primary suite, a larger kitchen and family room, or a second story. It is new construction attached to an old one: foundation, framing, roof, envelope, mechanical, electrical and finish, plus the tie-in work where new meets existing.

Additions are priced per square foot against the local build rate, with a size factor (small additions cost more per foot than large ones) and multipliers for finish level, site conditions and structural complexity such as second stories or bearing-wall removal.

This guide prices the work on our Additions & Renovations service page.

What's included

At the standard finish level, the range covers:

  • Foundation for the new footprint, tied into the existing one
  • Framing, roof and siding tie-in so the addition reads as part of the house, not a box bolted on
  • Windows and exterior doors matched to the existing home
  • Mechanical extensions — heating, cooling, plumbing and electrical run from the existing systems by our own crews
  • Insulation, drywall, flooring and finishes for the new space at the standard finish level
  • Weather-tight transitions where new meets old, the detail that fails first when it's rushed

Across our four states

Prices as of Nov 4, 2026

StatePriced atStandardPremiumLuxury
WashingtonSeattle · 1,000 sq ft (exact)$410K – $560K$500K – $680K$615K – $840K
IdahoBoise · 1,000 sq ft (exact)$285K – $385K$350K – $470K$430K – $580K
MontanaBillings · 1,000 sq ft (exact)$248K – $335K$305K – $410K$375K – $505K
ArizonaScottsdale · 1,000 sq ft (exact)$375K – $520K$455K – $635K$560K – $780K

Planning-level ranges from our current pricing tables, standard finish at a typical size unless a column says otherwise. Land, design and permit fees, utility connections and unusual soils are priced separately.

What drives the cost

  1. 1

    Size

    Additions are priced per square foot against your area's build rate, and small additions cost more per foot: under 400 sq ft carries a 1.35 size factor, 400–800 sq ft about 1.22, 800–1,200 sq ft about 1.15, and over 1,200 sq ft about 1.02.

  2. 2

    Second story

    Building up instead of out adds about 20% in the calculator for the structural work over the existing house, and another 18% when the project involves structural work over the existing frame.

  3. 3

    Wet rooms

    A dry bedroom or family room is the baseline. Adding one bathroom adds about 12%; a kitchen adds about 18%, because plumbing, venting and electrical have to reach it.

  4. 4

    Foundation type

    A slab is the baseline, a crawlspace adds about 4%, and a basement under the addition adds about 20%.

  5. 5

    Tie-in complexity

    A simple tie-in is the baseline. A roofline change adds about 8%; structural reframing of the existing house adds about 15%.

  6. 6

    Finish level

    Standard is quality builder-grade finishes that last. Premium adds about 22% and Luxury about 50% to the finished-space portion of the range.

  7. 7

    Exterior style

    The calculator's style options move the envelope cost: Northwest Traditional is the baseline, Modern Farmhouse adds about 6%, Craftsman about 10%, Northwest Contemporary about 14% and Modern Infill about 16%.

Seattle-area pricing

Our Puget Sound standard tier is the baseline, priced from our Federal Way headquarters. Inside Seattle city limits the calculator adds about 13% for SDCI permitting, parking and staging constraints and design review. The Eastside premium tier (Bellevue, Kirkland, Redmond, Mercer Island and neighbors) runs about 20% above the baseline for permit and impact fees, inspection lead times, tight lots and finish expectations. Island and ferry-served sites carry about 17% for barge and ferry logistics. South of the baseline, the South Sound and Peninsula tier prices about 12% below and the North Sound tier about 9% below, both served from our Federal Way headquarters; Southwest Washington is priced from our Vancouver office. Additions take the full location factor because they are new construction: foundation, framing, envelope and mechanical work priced at the local build rate.

A real example

Exterior Renovations & Additions, Puget Sound region

Our Exterior Renovations & Additions showcase collects the building-envelope work we do across multiple Puget Sound homes — bump-outs and rooflines tied into existing structures, alongside roofing, fiber-cement and LP siding with weather-resistive barrier, and energy-efficient window replacement and re-flashing. It shows the tie-in detail that an addition lives or dies on.

See Exterior Renovations & Additions

Permits and fees

Usually priced separately from the range above:

  • Design and permit fees — an addition needs drawings, structural engineering and a building permit, plus trade permits
  • Utility connections and upgrades, such as a larger electrical service or a bigger furnace or heat pump for the added load
  • Unusual soils or geotechnical work when the footing inspection finds fill, water or soft ground
  • Land-use work such as setback variances or critical-area reports where the lot requires them

Ways to save without cutting corners

  • 1

    Go a little bigger. Because the size factor drops as the addition grows, the next hundred square feet cost less per foot than the first hundred.

  • 2

    Keep plumbing out of the addition unless you need it. A bathroom adds about 12% and a kitchen about 18%; a bedroom or family room is the cheapest square footage you can add.

  • 3

    Match the existing roof pitch and eave line. A simple tie-in is the baseline; changing the roofline adds about 8% and buys mostly complexity.

  • 4

    Build on a slab or crawlspace unless you truly need a basement, which adds about 20%.

Questions, answered

It depends on your market and the size of the addition, which is why the calculator prices per square foot for your ZIP code. Run your number on /estimate and compare it to the cost of selling, buying and moving.

Usually yes. Most of the work happens outside the existing envelope until the tie-in, and we schedule the opening between the old and new spaces as late as possible.

You need drawings and structural engineering, which we handle in-house as part of design and permitting. Those fees are priced separately from the construction range.

Foundation, roof tie-in, mobilization and the mechanical connections are roughly the same whether the room is 300 or 600 sq ft. The calculator reflects that with a size factor that drops as the addition grows.

The calculator adds about 20% for building over the existing house, plus structural work on the frame below. It avoids using yard space, which on a small lot can be the deciding factor.

Book your free professional advice visit